Yes, it is looking much more like a kitchen these days, because we have APPLIANCES!! Unfortunately, the appliances are not installed. No, they are close to where they will reside ultimately, but for now they are creating a maze where once we had wide open nothing.
It got a bit stressful for me yesterday morning when they could not fit the refrigerator through the door. They removed the screen door and still not enough room. They then removed every door from the refrigerator. I believe that was the point where I heard the construction crew say “still no luck?” and an affirmative returned from the appliance crew. That is the point when I left the vicinity. I don’t know how they did it (I do still have a working door frame and door) but there is now a refrigerator with doors and drawers sitting in my breakfast room. The range and the dishwasher are here, as is the wok ring, but the hood is back-ordered.
We also have the soffit and crown molding up. Wow, does that stuff need a coat of paint. 🙂 I need to start thinking about what color to paint the walls, but I really need the backsplash and counter to make that decision.
The bistro table got delivered this morning. I was a bit annoyed as the delivery people refused to bring it in the house. They insisted the delivery was for garage or curbside only. Apparently had I wanted it in the house, I was supposed to pay more for that. It’s now in the garage, and that’s probably a better place for it than the house. The new ceiling fan and replacement tiles are in the front hall, my dining room is in my living room, my kitchen and breakfast room are in my dining room, and my appliances are, as I have said, all over the kitchen. Either my husband and I will open the boxes and bring the pieces into the house over the weekend, or I will throw myself on the mercy of the next construction crew to come by to help get it into the house to be assembled. Since there is no place really to put it, I don’t need yet another huge box taking up space. The only problem with the garage is that it floods if we have heavy rain. We’re expecting dry weather for the next few days so even that should work out fine.
I can see by the tracking number that the cabinet hardware is out for delivery, which means it may get installed next week as well. 🙂 I’m guessing that I won’t see the electricians and plumbers until after the counters arrive on Tuesday (I hope that was a definite “counters installed on Tuesday”). I suppose it’s possible we might see the crew that is going to modify one of the cabinets to be my broom closet. The plan is that the shelves are removed from the bottom of the cabinet, a divider added down the middle, and an opening cut in the shelf to allow the broom handles to fit and also be restrained. This is where I’m hoping to also put in the garbage can on a slide out base. I’ve been looking at that online. I’m not sure if that can be done as part of this job or if that is something we will have our painter (who is multi-talented) do for us.
There are still a lot of little bits and pieces that have not been confirmed. I’m still hoping for deck lights for the electricians. The various holes in the ceiling and the walls need to be addressed by the sheet rock folk. We need the new electrical sub-panel. The front hall will need new tiles because of the removal of the old radiator. None of those things have been discussed in any detail. But it does seem as if this project will wrap before, oh, let’s say Halloween. 🙂
Have to go – I hear the familiar, beloved sound of a beeping delivery truck outside – cabinet hardware!!!! 🙂